Design - Build

M-E Design Build, LLC (MEDB) "Mechanical Electrical Design Build" was incorporated by M-E Engineers Inc. as a separate company to enhance and supplement our design build ability to work with mechanical and electrical contractors.  M-E Engineers understands the need to control cost and work as a team player along with sub-contractors. Providing early design documents with quantities of systems organized for early pricing is critical to contractor selection.  MEDB completed INVESCO Field at Mile High, the first NFL stadium to be built utilizing a joint venture design/build structure with the mechanical contractor.